Skip to main content

Double Bathroom Reno

The clients were looking to update both their daughters bathroom and the master ensuite bath. Time was of major concern and so they were only going to tackle one at a time. In conjunction with the contractors we were able to set a time line of 5 weeks to complete both projects at the same time in order to reduce the invasion on the home and disruption of the client.

Their vision was for both spaces to be calm, clean and neutral as well as updated since neither room had been renovated yet on this 1980's home. The girls needed space for both of them to be able to coexist within the same room and the master was in desperate need of a larger shower and less bulky fixtures.

Before
Double Bathroom Reno